09. September 2024Traffic
Traffic: Short-term closure on Franzstraße section
The carriageway is being repaired
A section of Franzstraße, between the junction with Bernhard-Otte-Straße and the B67n slip road and exit, is closed for a short time due to necessary roadworks. The works and the associated closure should be completed by the end of Monday (9 September).
Diversions have been signposted. Cycle and pedestrian traffic can continue to pass the roadworks.