Traffic disruption on Vardingholter Straße
Between 10 and 13 September // Closure of a section of the road for roadworks
Between 10 and 13 September, the carriageway on Vardingholter Straße between Burloer Weg and the junction "Unter den Eichen"/Kurzer Weg will be repaired. During this period, the road will be closed to traffic and residents will be informed about the work.
Residents of Helene-Drießen-Weg will only be able to reach their homes on foot during this time, and access to Günther-Hochgartz-Ring will only be possible via Klemens-Honsel-Weg. Pedestrians and cyclists can still pass through the area via the pavement.
The city bus will be travelling via "Unter den Eichen" during the construction work, an alternative stop will be set up.