Urban land use planning
Here you will find the current announcements on the urban land-use plan procedures as well as an overview of all development plans and the land-use plan of the city of Bocholt.
Announcements and urban land use plans in ongoing proceedings
In the event that a link to the announcement does not open by direct clicking, simply open the link by right-clicking and "Open link in new tab or window".
Preparation of development plan 8-21, southern extension of the industrial park - ineffectiveness and rectification procedure
Amendment to development plan 8-8, 4th amendment, Timsmannweg day-care centre
127th amendment to the land-use plan, Timsmannweg day-care centre
Amendment of the development plan 10-12, 2nd amendment Barloer Weg
Amendment to development plan 4-10, 3rd amendment, Holtwick industrial estate
Legal validity of development plan 7-N2, 17th amendment Elsenpass 2 and 4
Legal validity of development plan K 6, 6th amendment Kreuzstraße/Theodor-Heuss-Ring
Legal validity of development plan 11-2, Brunsmannstrasse
Effectiveness of the 95th amendment to the land-use plan, Brunsmannstrasse
Effectiveness of the 113th amendment to the land-use plan for the Bahia leisure pool and expansion of the car park area
Change ban in the area covered by development plan 4-10, Holtwick industrial estate
Legally binding nature of development plan 2-4, 3rd amendment Öwerhook
Legal validity of development plan 8-23, Loikumer Weg
Effectiveness of the 115th amendment to the Loikumer Weg land-use plan
Development plans and land use plan
Here you will find an overview of the development plans and the land utilisation plan (FNP) of the city of Bocholt. Click on individual plan sections for more detailed information. You can display the land use plan and previous changes to the land use plan using the corresponding layer (select via layer list - centre symbol top right).
The information shown is for general information purposes only and may not be used as an official planning basis, e.g. for submitting a building application. Originals of the legally binding development plans and their amendments can be viewed at the main administration site of the City of Bocholt, Kaiser-Wilhelm-Straße 52-58, Urban Planning Division.
You can display the legend by clicking on the small square with the 3 horizontal lines in the bottom left-hand corner. Here you will find the detailed information behind the corresponding colour scheme:
Red line = development plan is legally binding and the plan can be downloaded as a pdf file.
Blue line = amendment to a development plan, this amendment is legally binding and can be downloaded as a pdf file.
Purple line = statutes of the city of Bocholt (design statutes, statutes for the preservation of advertising structures, etc.), which can be downloaded as a pdf file.
Green line = a planned amendment / establishment of a development plan / statute has been initiated, is still in the process or the process has not been continued. These plans are not / not yet legally binding, therefore these plans are not available for inspection or download.
You can display the legend via the small square with the 3 horizontal lines in the bottom left-hand corner. Here you will find the detailed information behind the corresponding colour scheme.
Do you need information from development plans or do you have any questions? We are happy to help!